Swimming Pool at Jumeirah

Project Overview

GripBooster carried out anti-slip floor treatment for a swimming pool area in Jumeirah 3, Dubai. The project focused on improving surface grip around the swimming pool, where water exposure can increase the risk of slipping. The treatment was intended to enhance traction on the designated floor surfaces while preserving the existing appearance of the flooring.

Project Details

Project Swimming Pool
Location Jumeirah-3
Customer James
Service Anti-Slippery
Time Spend 3 Hours
Date 12th March 2023

Project Summary

Scope of Work The work involved applying GripBooster’s anti-slip treatment to the designated swimming pool flooring. Particular attention was given to the poolside walking areas, where improved grip is important for safer movement. Application Process 1. Inspect the existing poolside flooring and identify the treatment areas. 2. Clean and prepare the surface for application. 3. Apply the anti-slip treatment according to the appropriate application procedure. 4. Allow the surface to complete the required treatment process. 5. Assess the treated area and conduct slip-resistance testing where required. Project Outcome The project was undertaken to improve grip on the swimming pool floor and help reduce the risk of slips on wet surfaces. Slip-resistance test results should be included separately if measurements were conducted.

Stanio Lainto

justo, posuere loborti viverra laoreet matti ullamcorper posuere viverra liquam eros justo, posuere lobortis non, viverra laoreet augue mattis